Southend Local Plan - Frequently Asked Questions (FAQs)
Proposed Submission Consultation (Regulation 19) – Government Direction.
Southend-on-Sea City Council has been formally instructed by Central Government (letter to Southend-on-Sea City Council from Rt Hon Matthew Pennycook MP, Minister of State for Planning and Housing, 23rd October 2026) to publish its current draft Local Plan for consultation. Further details of the instruction can be found here: https://www.southend.gov.uk/downloads/file/9765/letter-from-rt-hon-matthew-pennycook-mp
You can have your say on the draft Local Plan, its policies and proposals at https://localplan.southend.gov.uk/
The consultation will run from 6th November to 21st December 2026, closing at 5pm.
Q. What is a Local Plan and why does Southend need one?
A. A Local Plan is a document that sets out planning policies and proposals to guide and manage future development in an area. It sets out a vision and framework for how land will be used and developed. It is an important document that addresses a range of issues, including infrastructure provision, health and well-being, housing, employment, design and heritage, and management of the natural environment.
The Government requires all local planning authorities to provide a long-term Local Plan to meet our needs for the future. If we don’t have an up-to-date Local Plan, development will still take place, but we will not be able to use our own local planning policies to help decide where development should go, and what form that development should take. We will also be less able to require the schools, open space, roads and other infrastructure that are needed to support development.
This local plan will update existing planning policy documents including the Core Strategy (2007), Development Management Document (2015), Southend Central Area Action Plan (2018) and other supporting Supplementary Planning Documents.
The Southend new Local Plan will cover the period to 2045, guide planning decisions and set out policies to make sure development is sustainable, supported by appropriate infrastructure, aligning with local needs and aspirations.
Q. Haven’t you already consulted the public on the Local Plan?
A. There have been three earlier stages of consultation in the Local Plan’s preparation:
- Issues and Options document in 2019 – asked for views about the opportunities and challenges facing Southend to address in the new plan
- Refining the Options document in 2021 – set out more detailed consideration of these issues and potential policy options and potential site allocations
- Preferred Approach with Options document in 2025 – set out draft vision and strategic objectives, together with draft policies (including potential policy options) and potential site allocations.
Q. What is this Regulation 19 consultation about?
A. Regulation 19 is the name given to the final stage of the consultation. It is known as the "Publication" stage and is the final period of public consultation before the Draft Local Plan is formally submitted to the Secretary of State for independent examination by a Planning Inspector.
A Regulation 19 consultation is not the same as an early-stage [Regulation 18] consultation. By this point, the council has identified its preferred planning strategy, proposed development sites and planning policies. The consultation is therefore more focused and technical than previous stages.
Unlike previous consultations we are required to ask specific questions about how the plan has been prepared, whether its aims are achievable and whether it is based on robust evidence. We are therefore seeking your views on:
- Whether the plan is legally compliant;
- If it meets the test of soundness
The test of soundness is defined in the NPPF as being positively prepared, justified, effective and consistent with national policy.
Additional Information
Q. What is Regulation 19
A. Regulation 19 is the statutory publication stage of a Local Plan, where councils publish the version they intend to submit for examination and invite formal representations on legal compliance and soundness. It is defined in the Town and Country Planning (Local Planning) (England) Regulations 2012, Regulation 19, which requires authorities to make proposed submission documents available and notify consultation bodies before submitting the plan to the Secretary of State.
Q. What is Legal Compliance?
A. Local Plan legal compliance refers to meeting all statutory duties during plan preparation, submission, and examination. Key requirements include:
- Local Development Scheme (LDS) – preparation of the Local Plan should be in accordance with the LDS.
- Statement of Community Involvement (SCI) – the process for public engagement for the Local Plan should be in general conformity with the SCI.
- Town and Country Planning (Local Planning) (England) Regulations 2012 - The Local Plan should comply with the Town and Country Planning (Local Planning) (England) Regulations 2012.
- Sustainability Appraisal - the Council is required to publish a Sustainability Appraisal when publishing the Local Plan.
Q. What is the test of soundness?
A. Local plans are examined to assess whether they have been prepared in accordance with legal and procedural requirements, and whether they are sound. In accordance with the National Planning Policy Framework (NPPF), Plans are ‘sound’ if they are:
- Positively prepared: The plan provides a strategy that seeks to meet, as a minimum, the area's objectively assessed needs (including unmet needs from neighbouring areas where practical).
- Justified: It represents an appropriate strategy when considered against reasonable alternatives, and it is backed by proportionate evidence.
- Effective: The plan is deliverable over the plan period and is based on effective joint working on cross-boundary strategic matters.
- Consistent with national policy: It enables the delivery of sustainable development in line with the policies set out in national planning frameworks.
Q. What is the National Planning Policy Framework, and what version of the NPPF is the Southend new Local Plan being prepared under?
A. The National Planning Policy Framework (NPPF) sets out the government’s policies for plan-making and for making decisions on development proposals in England and how these are expected to be applied.
The Local Plan has been prepared and will be examined under transitional/ legacy arrangements provided for by the Government - i.e. that means rather than switching to the new NPPF (2026), the Local Plan will continue to be produced in accordance with an earlier version of the NPPF (December 2024).
Q. What will happen next?
A. There is a published timetable - the Local Development Scheme (LDS) - available on the Local Plan website that sets out when consultation is due to occur Local Development Scheme | Southend Local Plan and what will happen next.
The Proposed Submission document will be published for comment and then be submitted and examined in public before an Independent Inspector.
Q. What do we mean by infrastructure-led approach to development
This Local Plan adopts an infrastructure-led approach, covering a wide variety of different types of provision including:
- Utilities - water, sewerage, storm water drainage, flood risk, electricity, gas, waste management and telecommunications;
- Transport – highways, public rights of way including cycleways, railways, other public transport;
- Education - early learning, primary and secondary schools, specialist schools, further and higher education including libraries;
- Health and Welfare - GP's, dentists, clinics, health centres, emergency services and hospitals; and
- Social - sports, leisure, parks and community facilities.
An Infrastructure Delivery Plan has been produced to inform this Local Plan. It identifies key infrastructure requirements, including planned projects and how they are to be delivered, and the anticipated funding mechanisms over the Plan period.
Q. What if Southend does not produce new Local Plan?
A. Southend-on-Sea City Council has been formally instructed by Central Government to publish its current draft Local Plan for public consultation.
If Southend-on-Sea City Council does not produce a plan, the Government could decide to intervene and have a Local Plan prepared on behalf of the Council. This would have the disadvantages of limiting local involvement and decision-making as well as incurring extra expense.
The Government has also introduced several tests relating to housing delivery and supply. If a new Local Plan is not prepared in a timely manner, currently set by the Government, existing policies relating to housing will likely not be applicable.
This increases the risk of planning consents being granted by appeal and development occurring outside the Council’s control, including on Green Belt land.
Q. What is Southend’s housing requirement?
A. The Government sets out the approach for establishing housing provision through the preparation of strategic policies within Local Plans, and a national standard method for calculating how much housing should be provided for each local authority area in England.
The National Planning Policy Framework (NPPF) establishes a housing requirement through the adoption of a Local Plan. This:
- requires housing needs to be objectively assessed in line with the Government standard method for calculating housing need (often termed as a ‘policy-off’ approach); and
- then a separate assessment made as to whether (and, if so, to what extent) other policies dictate or justify constraint (a ‘policy-on’ approach).
It is through this two-stage process that housing provision is refined, tested and consulted upon through the preparation of Local Plans. Local planning authorities are then able to establish a housing requirement figure for their whole area, which shows the extent to which their housing need, as identified by the Government Standard Methodology (and any needs that cannot be met within neighbouring areas), can be met over the plan period.
Standard Methodology – what is it?
To support the Government’s objective of significantly boosting the supply of homes it is important that sufficient land is identified where it is needed through the plan making process.
Local Plans should be positively prepared seeking to meet objectively assessed needs. National planning policy states that housing need should be calculated using the national Standard Method. The housing need in Southend to 2045, conducted using the national Standard Method is 28,100 (or 1,405 homes per year). This is more than 4 times recent annual delivery rates.
Provision is made within the Proposed Submission Local Plan within Policy SP2 for 14,700 net dwellings to 2045, distributed as follows:
- Southend Central Neighbourhood (incorporating City Centre and Central Seafront): 3,600
- new neighbourhoods at Land North of Southend: 4,900
- a new community at Fossetts Farm: 1,350
- the other neighbourhoods of Southend: 1,850
- intensification across the city (windfall): 3,000
However, this results in a shortfall of 13,400 new homes over this period compared with the national Standard Method for calculating housing need.
Planning practice guidance makes it clear that Local Planning Authorities in preparing Local Plans should seek to meet housing need in full, based on the Standard Method, unless strong reasons can be given for not doing so and where there are agreements with neighbouring authorities on how and where unmet housing need can be met.
Such reasons will need to be justified by extensive and robust evidence including the consideration and assessment of alternative strategies as part of the Local Plan preparation and at the public examination of the plan.
Q. How were the potential development sites/ allocations (HELAA sites) identified and chosen?
A. HELAA stands for the Housing and Employment Land Availability Assessment. It is an assessment of the capacity, suitability, achievability and availability of land in the city for future development. A comprehensive “Call for Sites” is undertaken and sites put forward by landowners, agents, developers, businesses and the Council. These sites are then assessed for their suitability for development. Sites identified in the HELAA are not necessarily put forward for development at subsequent stages of plan preparation. The list of sites included in the HELAA reflects the position at the time of production. Again, a review of existing HELAA sites and monitoring of planning permissions helps to identify other potential available sites.
Q. Have the sites been individually assessed for their suitability?
A. Yes, housing sites have been assessed against a broad range of criteria including national policy constraints and existing infrastructure provision.
Q. Is there a list of proposed site allocations?
A. A list of proposed site allocations is presented as part of this consultation. You can find out more https://localplan.southend.gov.uk/
Q. Why do we need to plan for new employment floorspace?
A. As well as new homes there is a need to provide additional jobs within the city. These are required to support the local population and workforce, reduce the levels of commuting out of Southend for work, improve the range of jobs available for local residents and accommodate a growing population.
The Local Plan identifies sites and opportunities for new and intensified employment land. Together with the Airport Business Park this seeks to deliver 68,400sqm of employment floorspace by 2045. This meets employment needs as identified by the Southend Integrated Needs Assessment Part B Economic Needs (‘Economic Needs Assessment’) (2026).
Q. What is the Green Belt?
A. National Green Belt planning policy is set out within the National Planning Policy Framework (NPPF). The fundamental aim of Green Belt policy is to prevent urban sprawl by keeping land permanently open; the essential characteristics of Green Belts are their openness and their permanence.
The Green Belt in Southend is part of the much larger London Metropolitan Green Belt, stretching from east London across south Essex including land in the neighbouring local authority areas of Rochford and Castle Point. In Southend, the Green Belt designation covers four areas, namely the coastal stretches of open land to the west of Leigh; the Belfairs Wood area; land to the north of Eastwood and open land between Sutton Road and Great Wakering. Within the Green Belt there are some existing buildings.
Q. I thought Green Belt was supposed to be protected from development?
A. National Planning practice guidance sets out that a change to Green Belt boundaries should only be made through the Local Plan process where exceptional circumstances are fully evidenced and justified in accordance with national planning policy.
“Exceptional circumstances in ...this context include, but are not limited to, instances where an authority cannot meet its identified need for homes… if that is the case, authorities should review Green Belt boundaries in accordance with the policies in this Framework and propose alterations to meet these needs in full, unless the review provides clear evidence that doing so would fundamentally undermine the purposes (taken together) of the remaining Green Belt, when considered across the area of the plan” (NPPF para. 146).
The new Southend Local Plan Proposed Submission document includes provision to review the Green Belt and allocate land within it for a new neighbourhood on land north of urban area Southend (Site BG001) and at Fossetts Farm (Site HEA264). This is due to the shortfall of new homes over the period compared to the national Standard Method for calculating housing need, that cannot be accommodated on land outside of the Green Belt.
Q. What is the proposed new neighbourhood on green belt land north of Southend?
A. The provision of a new neighbourhood at Bournes Green on land north of Southend (LNOS – Site Allocation BG001) represents a significant opportunity to deliver comprehensive development and infrastructure. The new neighbourhood will deliver a substantial number of new homes (4,900) and employment floorspace (12,500sqm) over the Local Plan period, underpinned by a comprehensive package of supporting infrastructure and uses, including for education, health, community facilities, a network of formal green and blue Infrastructure, including significant parkland and public open spaces, sport, recreation and new and improved transport connections and services.
The boundary for the new neighbourhood allocation is defined on the Policies Map (annotated as BG001) with uses detailed in Policy DM2b. The development will provide for a large sustainable urban extension to the north of Southend and be based around the Guiding Principles as set out in Strategic Policy SP2b.
Q. How would the new neighbourhood contribute to the overall provision of housing in the city over the plan period?
A. National planning policy sets out that Local Plans should make provision for local housing needs (conducted using the national standard method) unless areas protected by the National Planning Policy Framework provides a strong reason for restricting development in the area or any adverse impacts would significantly and demonstrably outweigh the benefits.
Land designated as Green Belt to the north of Southend traversing the administrative boundary with Rochford District is being promoted by developers as part of the Local Plan preparation process to Southend City and Rochford District Councils for strategic scale development.
To support the overall provision of housing and government’s objective of significantly boosting the supply of homes, the land to the north of Southend could provide 4,900 new homes of mixed size and type within the City. This would include a higher proportion of both family and affordable housing than could be provided within the existing urban area for land availability and economic viability reasons.
It should be noted that the new neighbourhood, plus the site allocations within the existing urban area taken together would still not meet the housing need for Southend in full (based on the national Standard Method for calculating housing need). Neighbouring local authorities have continually been engaged about the constraints that the City of Southend faces and whether they would be able to contribute towards Southend’s unmet housing needs.
Q. How will existing infrastructure and services cope and what new infrastructure will be provided to support the growth?
A. It is recognised that services such as schools and doctors are stretched in some locations and that utilities need to be improved in various places. We are working closely with colleagues responsible for schools, parks, roads, etc within the Council as well as with external parties, such as the utility providers and the NHS to try to ensure that infrastructure needs are adequately planned for.
The new Local Plan sets out an infrastructure-led approach. An Infrastructure Delivery Plan (IDP) has been prepared alongside the Local Plan, setting out what infrastructure is needed to support the growth targets within the plan.
The IDP must set out not only the infrastructure required and when but also how it is expected that this will be funded. Some of this will come through infrastructure providers own plans, applications for government funding will be required and development contributions.
All new developments in the city must contribute to the delivery of appropriate infrastructure, whether directly or through financial contributions, for example through the Community Infrastructure Levy or through Section 106 planning legal agreements.
The Local Plan identifies the broad requirements for infrastructure, both to support potential site allocations within the existing urban area of Southend, and for the new neighbourhood option, based on evidence gathered for the IDP.
Q. How does the Local Plan relate to the emerging Transport Strategy and Local Transport (LTP 4)?
A. As the Local Plan is prepared it will be both informed and will inform other strategies and initiatives, including the preparation of the Southend Transport Strategy and LTP4.
How transport and land use planning interact is recognised as being very important to the preparation of the Local Plan given the constraints on parts of the transport network, particularly the strategic road network. Improving walking, cycling and public transport networks and incorporating these into new developments will be important to developing attractive and active neighbourhoods, and contributing to healthy lifestyles.
A Transport Assessment has been prepared to support the Local Plan and sets out a schedule of mitigation to ensure that growth can be adequately accommodated.
Q. What is a sustainability appraisal?
A. A Sustainability Appraisal is a legally required document, which sits alongside the Local Plan and seeks to ensure that all areas of the proposed Local Plan are assessed against a range of social, economic and environmental objectives. This work is undertaken independently and will impact on each stage of the Plan’s preparation. Carefully considering these three objectives will enable us to deliver sustainable planning policies. The Sustainability Appraisal is also open to consultation at the same time as the Local Plan.
Q. What will happen to the existing Planning Policies?
A. The Council currently has a number of adopted development plan and supporting documents, consisting of:
- Core strategy 2007
- Development Management Plan 2015
- Southend Central Area Action Plan 2018
- London Southend Airport Joint Area Action Plan 2014
- Essex and Southend Waste Local Plan 2017
The new Local Plan will have a plan period to 2045 and will ensure that local planning policies are as up-to-date as possible. Upon adoption, the new Local Plan will replace: the Core Strategy; the Development Management Document; and the Southend Central Area Action Plan, and a small number of policies within the JAAP relating to Southend.
The London Southend Airport and Environs Joint Area Action Plan (prepared jointly with Rochford District Council) and the Essex and Southend Waste Local Plan (prepared jointly with Essex County Council) will be reviewed separately as they are cross-border documents, although the Local Plan may contain some strategic level policies for each.
Q. How do I get involved and how can I find out more?
A. The Southend new Local Plan Proposed Submission consultation is available online for you to read and comment on: whether the plan is legally compliant; if it meets the test of soundness.
We would encourage you to respond online https://localplan.southend.gov.uk/
You can, at this stage of consultation, alternatively use the editable consultation response form, which is available upon request. Please email us to request a copy: planningpolicy@southend.gov.uk (or alternatively call 01702 215000) and return the form to us to this address by email.
Alternatively by post to: Planning Policy, Department for Environment and Place, Southend-on-Sea City Council, PO Box 6, Civic Centre, Victoria Avenue, Southend on Sea, SS2 6ER.
Please ensure that your response clearly states which part of the Local Plan you are responding to, including policy reference and/ or site reference as applicable. This will help us when we are analysing any responses received.
Hard copies of the Plan will be available at each of the Council’s libraries and Civic Centre for reference, during normal opening hours.
You can also visit the Your Say Southend https://yoursay.southend.gov.uk/ consultation platform which will provide information and links to the consultation.
Q. How long is the consultation for?
A. The consultation period will run from Friday 6th November 2026 until Monday 21st December 2026 (closing at 5pm).
Q. I have a question about the consultation; how do I contact you?
A. If your question is not answered in this FAQ or the Proposed Submission local plan document, we are contactable in the following ways:
- Online at: localplan.southend.gov.uk
- By email to: planningpolicy@southend.gov.uk
- By post to: Planning Policy, Department for Environment and Place, Southend-on-Sea City Council, PO Box 6, Civic Centre, Victoria Avenue, Southend on Sea, SS2 6ER
For more details visit: How to have your say | Southend Local Plan
Q. Will my comment be made public?
A. By law we are required to publish the comments we receive about the Local Plan and make them available for all to see, including your name. No other personal information will be published. This meets the requirements of the UK General Data Protection Regulation 2018.
Q. I don’t use the internet; how can I respond to the consultation?
A. Whilst we prefer comments to be made on our online consultation portal https://localplan.southend.gov.uk/, we will also accept paper responses. If you wish to do this, please post your written comments back to us using the consultation response form (available on request).
Please ensure that your response clearly states which part of the Local Plan you are responding to, including policy reference and/ or site reference as applicable. Visit one of Southend’s libraries or Civic Centre to view a copy of the Plan.
Write to us at: Planning Policy, Department for Environment and Place, Southend-on-Sea City Council, PO Box 6, Civic Centre, Victoria Avenue, Southend on Sea, SS2 6ER
Q. What happens next?
A. Further information on the stages of plan preparation can be found in the Local Development Scheme (LDS) https://localplan.southend.gov.uk/
Q. After the Local Plan is finally approved, will it remain untouched until 2045?
A. A Local Plan must be reviewed at least every five years after it is adopted. This ensures that its policies still reflect national guidance and remain up to date. The Local Plan may not need changing or a partial review may only be necessary. Any significant changes would require new public consultation to be undertaken.
Need help using the site? Contact us